Wan’an Junction Second-Line Ship Lock

Project Period: 2019–2022

Project Manager: Kong Lingbao

Client: CCCC Fourth Harbor Engineering Co., Ltd.

Equipments Supplied:Reinforcing Cage Rolling Welding Machine, Steel Bar Sawing, Threading & Grinding Production Line, Steel Bar Shearing Line, Steel Bar Bending Center, Cover Beam & Slab Welding Robot

The Wan’an Junction Second-Line Ship Lock has a design maximum working head of 32.5 meters, ranking as the 8th highest-head single-stage ship lock in the world and 4th in China. Its lock wall height is the highest in Jiangxi Province, and it is honored as “The First Lock on the Thousand-Li Ganjiang River”.

DJI_0060.JPG
DJI_0013.JPG

The project is equipped with an intelligent steel processing and distribution center, including three production lines for reinforcing cage fabrication, mechanical connection threading, bending and stirrup bending, as well as 2 overhead cranes and 1 welding robot, achieving dual assurance of safety, quality and efficiency in steel processing.

The reinforcing cage rolling welding machine automatically completes a full set of procedures including main bar threading, stiffening ring welding and spiral winding. The entire production of one finished reinforcing cage can be operated by only 2 construction workers.

DJI_0217.JPG
DJI_0022.JPG

More

3月19日 (1)(5).png

2024-2028

Hanguangmian Expressway Expansion Project

3月10日(3).png

2024

Zhangzhou-Shantou High-Speed Railway (Fujian Section) Station Front Works

DJI_20240921104552_0020_D.JPG

2024

Station Front Works of Nantong–Ningbo High‑Speed Railway

DJI_0100.JPG

2019–2022

Wan’an Junction Second-Line Ship Lock